Table September 7 8, 2012 This second day of field table element build is going great.
All projects are started and much was finished.
A strange thing happened with the switch model - the middle hole in
the beam was too small for an axle
so we switched it out with a beam from school.
Table and chair set up.
Some of the major models are near finished
or finished.