Train Safety at 4-H

July 1, 2005

Four groups made different train track layouts.



Over


Across                                         Through


The mail can be dropped down into the train.

 
 


Switches can make the trains go different directions.

Level crossings have safety guards.

Keeping two trains moving safely takes planning and watching.



Here comes the train.

LEGO  Links of Linda Hamilton hamilton@marshall.edu
  • Webpages and pictures on http://www.marshall.edu/LEGO
  • Web camera on http://legocamera.marshall.edu
  • Teleoperate LEGO CITY at http://lego.marshall.edu
  • NASA site of Remote Sensing on http://SENSORSCITY.marshall.edu