June 6 and 7, 2012 The 3rd and 4th days the six groups set up train tracks. We learned
about train safety for people, vehicles, and trains.
Once the track was complete a train or two was tested to see if could
go safely through the entire set up.
Then they built stations and places for moving cargo and getting fuel.