Boom Project
The three requirements that the boom could fold, be as long as possible,
and hold up a weight.
Measure height from floor with out and with weight.
These models were made to test out the time it took to build
so that the projects could be presented at the
WV
State Science Teachers Conference on September 21, 2001.