Alien Adventures
January 18, 2012
The rover are complete but need to have firmware loaded.
That was not as easy as it should be because the batteries needed to
be changed and
sometimes the download had to be done more than once to complete.
Then the programming for forward and turn was worked out for 3 of the
rovers.
The red set groups worked on a way to get the materials off the "space
ship".
http://netapps.marshall.edu/lego/legoCAD/Mars/legocadmarschallenges.htm